Recent Jobs For Linn's Plumbing

July 7, 2025 | Prague, OK
At the meter, installed the new meter union and ran 1 inch pex from the meter and tunnel under into the crawlspace. Installed the necessary sleeves. We had to run approximately 25 foot across the crawlspace before we got to the main service line at this point we installed the silcock ...

May 21, 2025 | McLoud, OK
Dug the hole for the aerobic tank. Set the tank 10’ from the house and ran sprinkler lines out 50’ to the west and set the first head. Set the second head 60’ from the first to the south. Both heads spray 360° w/ 30’ spray radius. Tied in the sewer and added a cleanout. ...

May 15, 2025 | Eufaula, OK
Dug and leveled the aerobic tank hole. Pumped out the existing septic tank and reused it as an extra trash tank. Set the aerobic tank and tied it into the septic tank. Ran 70’ of sprinkler lines setting 2 sprinkler heads back to back spraying 180°. Ran wire from the disconnect to the ...

May 5, 2025 | Meeker, OK
Installed aerobic system. Dug and set tank, leveled it. Installed 4” sewer line drop with cleanout and plug for RV. Installed power line from control box to shop and wired in. Installed 60’ of sprinkler line 2 heads. Installed water line from well head to shop with bury hydrant. Installed t post with ...
Total: 60