Job completed for Sue M.
Completion date: April 16, 2025
Location: Checotah, OK
Solutions provided:
Installed aerobic system. Tied into the 3” pvc coming out of the house and installed a cleanout. Ran 30’ of 4” to the tank. Connect the electrical to the disconnect on the house. Ran sprinkler line setting a sprinkler head at 60’ and 120’ spraying 360°. Backfilled around the tank and filled with water. Tested and gave the customers the warranty information.
Team members on this project:
Drew